CITY OF LITHONIA PROPOSED PROJECT LIST  Recommended SPLOST Expenditures
Proposed Total SPLOST Expenditures  $       1,784,215.00
TRANSPORTATION IMPROVEMENTS
 Max Cleland Blvd/Stone  Mountain St Intersection ( Road resurface;  pedestrian facilities & signalization)
      Crosswalk repair @ 6949 Main Street
      Installation/Repair of Sidewalks/Trails in the following areas:  Conyers      Street; Bruce Street; Klondike Road; Johnson & Cagle Streets; Parkway Drive;  Park Drive; Ida Street; and Wiggins Street
      Resurfacing of roadways
      Traffic signalization improvements at intersection of Main St & Klondike Rd
TOTAL  $       1,076,000.00
INFRASTRUCTURE IMPROVEMENTS
      Repair & Install street light fixtures
      Gateway signage improvements
     Wayfinding signage (Main Street, Lithonia Park, Bruce Street Park)
     Landscaping at Gateways and Conyers St from Main/Rock Chapel Rd to         Bruce St
     Trash Receptacles
      Checking/Upgrading water pressures in fire hydrants
TOTAL  $          352,004.00
PUBLIC SAFETY (POLICE SERVICES & PUBLIC WORKS)
POLICE SERVICES
           Police Vehicles w/equipment
           Police Vests
PUBLIC WORKS
           Street Sweeper/Sewer Vac Vehicle
TOTAL  $          137,000.00
FACILITIES IMPROVEMENTS
      Install handicap railing at city hall entrance
      Repair/replace steps at city hall entrance
TOTAL  $             10,000.00
STEWART AMPHITHEATER
      Add noise filtering screens, structures
      Install shade structures
      Replace broken concrete flooring on patio level
TOTAL  $             90,000.00
LITHONIA PARK
      Install bathrooms
      Level field areas
      Improve drainage system
      Install lighting along park roadway
TOTAL  $             30,000.00
MAINTENANCE, OPERATIONS & RELATED PROJECT COSTS
TOTAL  $             89,211.00
GRAND TOTAL SPLOST PROJECTS 2018-2023  $       1,784,215.00
*NOTE:  It is projected that the City of Lithonia will receive about $1.78 M in SPLOST funds over six years. The proposed SPLOST Project List may require additional funding sources to cover any costs that exceed the available SPLOST proceeds.